conew

CONEW-WALL


Construction cross-section diagram

Construction cross-section diagram - LEGO block-style modular assembly
- No necessity for ground reinforcement work
- Over 90% mechanization (backhoe with 2-3 skilled workers)

Geogrid unnecessary for gravity retaining wall system
A versatile retaining wall capable of gravity-based, grid connection, and anchor installation methods
Construction cross-section diagram

Consturction Process

  • Digging the ground and Concrete pouring
    1.Digging the ground and Concrete pouring
  • Install the bottom block
    2. Install the bottom block
  • Install the middel bloc
    3. Install the middel block
  • Install the top block
    4. Install the top block